To much snow: yard Miesbach get support from outside

The snow masses in Miesbach put a strain on man and machine alike. A crisis headquarters has now been formed in the city hall. Construction site and contractors to work

The snow masses in Miesbach put a strain on man and machine alike. A crisis headquarters has now been formed in the city hall. Construction site and contractors to work day and night.

Miesbach – With a radio call, the city of Miesbach worked on Friday to help. Those who have a vehicle with a tiller should contact the City Administration. Otherwise, the masses of people in the city circle no longer bear snow. Because not only Bauhof staff and subcontractors need his rest, but also technology. Always re-grinding would fail and it would have to be in the workshop, reported yard manager Jürgen Fischer. Once the chain breaks, sometimes it’s leather with the bolt out. The deliveries of spare parts are also due to bad road conditions, reported the general manager of the city hall, Gerhard lider. “We even picked up something from Munich.”

+ roof abschaufeln in a different way: Without the head this man would not stand a chance, her Transporter.©Thomas Plettenberg

see also: disaster event: on Monday, schools remain in the district

Miesbach is in extraordinary condition. Even on the main roads there is snow, meter-high walls and multiple towers, many of which are only passable in one lane. Some side and residential streets have turned into pedestrian streets, because not even the plows can drive away the white mountains anymore. There is simply no more room. The only consequence: the snow must disappear. With a milling machine or excavator on the truck, and then out of town.

Right, the fisherman is trying with his men. But not only are their driving hours limited by law, but partially overloaded technology complicates the work of construction site employees, such an important job nowadays. In the meantime, the city administration established a crisis headquarters. In addition to fisheries and the leading construction technician, Jürgen Brückner is in charge of coordination. The goal is ambitious: “We want to sail once by Monday evening,” says Fischer. Therefore, his people work on weekends. Even at night, it grinds. At one o’clock in the morning it happens again. Since it’s quieter on the streets and it’s easier for us, says the head of the yard.

see also: tiller, wheel loader, truck: warehouses fight snow masses

+ Jürgen Fischer is the director of the construction site, which is presented by Miesbach.©Thomas Plettenberg

slide In this context, he and the leaders renew their request to the citizens, without snow from the roofs or Hofzufahrten on the streets. “Then we won’t pass anymore.”

At least with regard to resources, it happened on Friday, a slight relaxation. The call in the media met with a great response, says the presenter. – Willingness to help is huge. There were even offers from Swabia and Francia. For reasons of logistics, the decision was made, but for companies from the region. The house of entrepreneur Hamer with its double head turned out to be particularly valuable. “We have a large part of Parsberg free again,” says the leader.

Citizens can read which roads are still blocked on the city’s website (www.miesbach.de). According to Fischer, the list is always empty. And for that, above all, he wants “it won’t snow anymore”.

Updated date: January 13, 2019, 12:00 p.m

Categories: Optical Illusion
Source: newstars.edu.vn

Leave a Comment